        posted
        I want to convert an area that WAS a half bath (the old owners converted it in a room the size of a closet, WHY?!?) BACK into a half bath. These are the things I need to accomplish, I just want to make sure the ORDER of things would be right:

        *install new light fixture that would be over the vanity
        *sand and re-paint the solid wood door
        *replace the trim
        *cover the vinyl floor with vinyl wood planks
        *get plumber out to re-plumb the sink and toilet
        *install toilet
        *install vanity

        I like the wall color, so no paint.

        I appreciate all your help!!
         
        Posts: 5 | Registered: Jul 14, 2012Reply With QuoteReport This Post
        Picture of joecaption
        posted Hide Post
        Oh your going to have to do some painting, he's going to have to open up the walls in order to redo the plumbing for the sink and the toilet.


        joecaption
         
        Posts: 17745 | Location: Hartfield VA | Registered: Jan 31, 2004Reply With QuoteReport This Post
        Picture of Jaybee
        posted Hide Post
        Plumbing first, then rebuild and finish all the rest.


        Jaybee
         
        Posts: 9088 | Location: Knoxville, Tennessee | Registered: Sep 27, 2003Reply With QuoteReport This Post
        posted Hide Post
        Crap, ya'll are worse than my husband, telling me things I don't want to hear! Why don't you lie next time and let me stay in my happy delusional place? Well, thanks for the info!!
         
        Posts: 5 | Registered: Jul 14, 2012Reply With QuoteReport This Post
        Picture of joecaption
        posted Hide Post
        And what's the ansewer that will work? Yes Dear. Reality sucks. LOL


        joecaption
         
        Posts: 17745 | Location: Hartfield VA | Registered: Jan 31, 2004Reply With QuoteReport This Post
        posted Hide Post
        well, you can watch Hillbilly Renovations if you don't want to do it correctly.

        why put in nice things, when you have to rip them out and bust stuff up to plumb and test, then redo the nice things? first, demo and build the electrical and plumbing at least to code, preferably to current best practices. then after test and approval by the inspector, put walls back in, and then pretty it up.

        what's on the other side of this little half bath? can you steal some space and make it a full bath without compromising any bedrooms or living space? if so, that's a win-win at resale or refinancing appraisal.

        oh, paint. get a chip off the wall larger than an inch square, put it in a safe container, and take it to the paint counter. every serious paint operation, even those in big box improvement stores, has a computer paint matcher. scan the chip, out comes the formula, mix the paint and compare. no problem.

        This message has been edited. Last edited by: swschrad,


        sig: if this is a new economy, how come they still want my old-fashioned money?
         
        Posts: 4725 | Location: North Burbs, MN | Registered: Mar 14, 2007Reply With QuoteReport This Post
        posted Hide Post
        As was said before, start with the plumbing (after whatever demo is necessary to install the plumbing). Then follow the general rule of starting at the ceiling and working your way down to the floor.

        I would try this order:
        1) get plumber out to re-plumb the sink and toilet
        2) redo any drywall and flooring, and paint the walls where the drywall was replaced *added step
        3) install new light fixture that would be over the vanity
        4) sand and re-paint the solid wood door
        5) replace the trim around the door
        6) install toilet
        7) install vanity
        8) cover the vinyl floor with vinyl wood planks
        9) replace the trim around the floor

        At least that's what I think I would do, would be glad to hear some feedback.
         
        Posts: 3 | Location: United States | Registered: Jul 08, 2012Reply With QuoteReport This Post
        Picture of garethcooper9
        posted Hide Post
        The plumber needs to do his job first. Everything else just doesn't make any sense.

        Holland And Green Architectural Services
         
        Posts: 30 | Registered: Jul 03, 2012Reply With QuoteReport This Post
          Powered by Social Strata  
         

            DIY Message Boards  Hop To Forum Categories  Home Improvement  Hop To Forums  Remodeling    Taking back our half bath

        © Scripps Networks 2009

        Advertisement

        Posting Guidelines

        • Please be sure posts are category appropriate.
        • No off-topic or off-color postings.
        • Postings may be deleted at the discretion of DIY moderators.
        • No advertising is allowed.
        • Be nice. No name calling, personal attacks or flaming.
        • Certain words will trigger moderation of the post. These words mostly cover political or religious topics, which are OFF the topics covered by DIY.

        Full Guidelines

        For general message board help, click the tab labeled "Tools," and choose "Help" from the dropdown menu.