        posted
        I live in Florida and my home has a concrete slab. My shower pan is part of the house slab and is recessed 3 ½” below the house floor level slab. I am remodeling my shower and have relocated and replaced my old shower drain. I have chiseled up the slab I have purchased a Sioux Chief 2” PVC Square-Head Shower Pan Drain Model # 821-2PQCP from Home Depot.

        Do I concrete all the way up to the PVC pipe that comes through the slab and if so do I need to put some type of protective material between the drain pipe and the new concrete?

        Also, I assume I should apply a concrete bonding agent to the existing concrete before applying the new Sakrete 5000 Plus Concrete Mix?

        How long should I wait after the slab repair before I replace the mud bed?
         
        Posts: 4 | Registered: Aug 17, 2012Reply With QuoteReport This Post
        Picture of Jaybee
        posted Hide Post
        From the bottom up:

        Subfloor
        sloped mortar bed
        liner
        mortar bed
        tile or other surface.

        Check out here:

        http://www.siouxchief.com/Reso...n%20Instructions.pdf


        Jaybee
         
        Posts: 9160 | Location: Knoxville, Tennessee | Registered: Sep 27, 2003Reply With QuoteReport This Post
        posted Hide Post
        Jaybee, thanks for responding.

        The Sioux Chief Link you sent me is for a wood subfloor installation and does not answer my three questions.

        (1) Do I concrete all the way up to the PVC pipe
        that comes through the slab and if so do I need
        to put some type of protective material between
        the drain pipe and the new concrete?

        (2) Also, I assume I should apply a concrete bonding
        agent to the existing concrete before applying
        the new Sakrete 5000 Plus Concrete Mix?

        (3) How long should I wait after the slab repair
        before I replace the mud bed?
         
        Posts: 4 | Registered: Aug 17, 2012Reply With QuoteReport This Post
        Picture of Jaybee
        posted Hide Post
        quote:
        Originally posted by Altair IV:
        Jaybee, thanks for responding.

        The Sioux Chief Link you sent me is for a wood subfloor installation and does not answer my three questions.

        Just treat that drawing like the wood floor is your recently demo'd concrete and it will be exactly what you need

        (1) Do I concrete all the way up to the PVC pipe
        that comes through the slab and if so do I need
        to put some type of protective material between
        the drain pipe and the new concrete?

        You will pour your new concrete up to the PVC drain. The only provison is to add some packing (paper, cloth etc.) to the weep holes on the drain to keep them open

        (2) Also, I assume I should apply a concrete bonding
        agent to the existing concrete before applying
        the new Sakrete 5000 Plus Concrete Mix?

        A bonding agent cannot hurt. The thicker your new slab is and the courser the sub-surface below then the less a bonding agent is needed. For a shower, if you have a slab remnant that is still structurally strong and you add at least 2" of new concrete above, the bonding agent will not be needed. Again though, it doesn't hurt and is an easy and inexpensive step.

        (3) How long should I wait after the slab repair
        before I replace the mud bed?


        You just need to wait for each layer to cure - usually overnight - before adding another layer. You should be able to do this in 2 pours - one to replace the slab thickness and make a sloped surface for the liner and the second to continue the sloped surface and to give you enough thickness above the liner to install tile.


        Jaybee
         
        Posts: 9160 | Location: Knoxville, Tennessee | Registered: Sep 27, 2003Reply With QuoteReport This Post
        posted Hide Post
        Jaybee,

        Thanks for the info!! Cool
         
        Posts: 4 | Registered: Aug 17, 2012Reply With QuoteReport This Post
          Powered by Social Strata  
         

            DIY Message Boards  Hop To Forum Categories  Home Improvement  Hop To Forums  Plumbing    Replacing Shower Drain In Concrete Slab

        © Scripps Networks 2009

        Advertisement

        Posting Guidelines

        • Please be sure posts are category appropriate.
        • No off-topic or off-color postings.
        • Postings may be deleted at the discretion of DIY moderators.
        • No advertising is allowed.
        • Be nice. No name calling, personal attacks or flaming.
        • Certain words will trigger moderation of the post. These words mostly cover political or religious topics, which are OFF the topics covered by DIY.

        Full Guidelines

        For general message board help, click the tab labeled "Tools," and choose "Help" from the dropdown menu.